Wondabyne Barge Ramp, Pontoon and Gangway

GPM completed works at Wondabyne Barge Ramp for Sydney Trains.

Project Description

GPM completed works at Wondabyne Barge Ramp for Sydney Trains.  Work included demolition and removal of the existing concrete barge ramp, pontoon & gangway and the construction of a new pre-cast concrete barge ramp including scour protection, design and construction of a gangway and pontoon structure and the installation of 4 x steel piles at Site 3, Wondabyne at Mullet Creek in the Hawkesbury River. This project had a tight construction program of two weeks however GPM was able to complete the works within the required timeframe.

Get In Touch

Make An Enquiry with Gpm Marine Constructions