GPM completed works at Paradise Beach Tidal Pool Renewal – Work Included:
• Seahorse relocation and monitoring
• Demolition of existing timber boardwalk, tidal stairs, timber waler & shark net
• Demolition & removal of piles
• Supply and installation of steel and timber piles
• Supply and install all HDPE sleeves, welded caps and concrete socket
• Supply and construction of timber walers
• Supply and install jetty sub-structure
• Supply and install timber decking and toe-rails
• Supply and install tidal stairs
• Supply and install ladders, signage
• Painting and protecting timberwork
• Supply and install shark netting with divers’ assistance