As a $6.5 million major revamp of the Mallacoota area, East Gippsland Shire Council Upgraded the Bastion point boat ramp and associated infrastructure to include:
A 60 spaces, car and trailer car park with public toilet block.
Construction of an elevate causeway between the end of Bastion Point rd and the newly constructed boat ramp, the eastern side of the causeway was retained by using a combination of geo-bags and rock armour.
The proposed boat ramp has a 60m long timber jetty for berthing of vessels.
Protecting the boat ramp from the south is a 150m long break wall.
Despite bad weather and opposition from a small minority group that attempted to disrupt operations the project was completed on time and within budget.
Address: Unit 14L, 175 Lower Gibbes Street, Chatswood NSW 2067