Dumaresq Reserve Rosebay

Another quality work completed by GPM. The construction involved the removal of the existing failed wall, the installation of a deep footing beam which was below sea level and required constant water pumping to maintain a dry working area, the installation of a new sandstone log seawall with concrete backing and stainless steel dowels through the capping stones, backfill and turf installation.

Project Description

Dumaresq Reserve Rosebay

Another quality work complete by GPM. The construction involved the removal of the existing failed fall, the installation of a deep footing beam which was below sea level and required constant water pumping to maintain a dry working area. The installation of a new sandstone log seawall with concrete backing and stainless steel dowels through the capping stones, backfill and turf installation.

Get In Touch

Make An Enquiry with Gpm Marine Constructions