Another quality work complete by GPM. The construction involved the removal of the existing failed fall, the installation of a deep footing beam which was below sea level and required constant water pumping to maintain a dry working area. The installation of a new sandstone log seawall with concrete backing and stainless steel dowels through the capping stones, backfill and turf installation.