GPM Marine completed dredging works at Coffs Harbour regional boat ramp

Project Description

Coffs Harbour Dredging

GPM Marine have completed two rounds of dredging works at Coffs Harbour Regional Boat Ramp. The first dredge included the excavation of 10,000 cubic metres of material and  the second dredge included the excavation of 12,500 cubic metres of material. All materials were removed from the inner harbour of the boat ramp.

The dredge works allow for better access to the boat ramp and pontoon facilities, whilst creating a safe right of passage to navigate in and out of the channel.

 