GPM completed the removal and replacement of the boat ramp at Brogo Dam. The works included demolition of the pre-existing boat ramp and placement of precast concrete for the new ramp. The GPM crew also poured insitu concrete for the abutment and surrounds. The site was difficult to access and environmentally sensitive, so the GPM specialist equipment and team were required to complete the works successfully.
Address: Unit 14L, 175 Lower Gibbes Street, Chatswood NSW 2067