Manly Federation Boardwalk Repairs

Manly Federation Boardwalk Repairs

Project Description

Manly Federation Boardwalk Repairs

GPM have demolished & rebuilt Manly Federation Boardwalk – it has been completed with specified repairs including:

• Removal and disposal of selected poor condition timber decking and girders
• Removal and disposal of timber handrail and posts
• Removal and disposal of corroded steel I Beam
• Removal of ledger beam near stairs and rotted girders/decking
• Repair of displaced girders
• Removal of corroded steel angles on each headstock
• Replacement of timber decking, girders and ledger beam
• Supply and install of stainless steel rods and 100 x 100 FRF posts
• Supply and install supports for existing headstocks cantilevered off concrete piles
• Supply and install 3 x steel I Beam
• Supply and install new timber handrail with posts, painted in “Manly Barley”
• Supply and install new toe rail along boardwalk