GPM Marine have completed works for the Little Beach Boat Ramp at Nelson Bay.
Works included the installation of steel piles fitted with HDPE plastic sleeves and precast concrete headstocks , pre-cast concrete Panels, in-situ concrete footings and slab, handrail, staircase built in mixed materials such as FRP, APR and stainless steel and the installation of selected pink granite rock armour alongside the in-situ area of the boat ramp.
The new ramp will allow better boating access/launching to Little Beach and will benefit not only the local community but tourists during the warmer months.