GPM have completed works on Dixs Wharf, Lake Illawarra, The GPM crew demolished the existing wharf, seawall and boat ramp whilst ensuring no damage to the surrounding environment. The crew installed pre-cast concrete plinths and wrapped existing piles in protective coating to create a secure foundation. Blocklayers assisted in the installation of blockwork seawall. The GPM crew installed girders, headstocks, FRP, handrails and all associated fixings on the jetty. The final stage of works included excavation of existing landscape, installation of sufficient drainage, new concrete boat ramp and walkway, and the installation of new timber bench seats.
Address: Unit 14L, 175 Lower Gibbes Street, Chatswood NSW 2067