GPM were contracted to complete a Jetty, Pontoon and Mooring Pen. GPM Barge and excavator were used to complete the works. This included piling using turpentine piles and timber substructure to then supply and install new timber stub jetty. Pontoon system was supplied and installed including 2 x steel sleeved piles – and Mooring Pen included steel piles driven into deep water.
Address: Unit 14L, 175 Lower Gibbes Street, Chatswood NSW 2067